Logo — SPECTRA

SPECTRA / INVESTMENT POWDERS

NEXUS

High-temperature casting.
Just add water.

A premium phosphate bonded investment for platinum, palladium, stainless steel and chrome cobalt alloys. Mixes easily with water to form a smooth, consistent slurry.

Calculate your mix ↓
NEXUS — SPECTRA
  • Aluminum vacuum-sealed sack
  • Water-mix formulation — no additional binder liquid required.
NEXUS – Simple preparation. Precise results — SPECTRA

THE NEXUS DIFFERENCE

Simple preparation.
Precise results.

NEXUS is a high-temperature phosphate bonded investment developed for platinum, palladium, stainless steel and chrome cobalt alloys. Its water-only formula combines straightforward preparation with stable performance throughout burnout.

  1. A straightforward water mix
  2. Consistent Performance
  3. Sharp detail. Less finishing.

PREPARE YOUR BATCH

Your mix.
Calculated.

Water only · method-specific quantities · 10–15°C

kg

Enter the weight of dry powder.

WATER REQUIRED
0.28 liters

1 kg powder × 0.28 = water in liters
No binder concentrate required.

Water 10–15°CWorking time 7 min
  1. 01 · PREPARE

    Weigh powder & water

    Measure the calculated water at 10–15°C and weigh the NEXUS powder.

  2. 02 · IN THIS ORDER

    Add powder to water

    Always add powder to the measured water.

  3. 03 · 4–5 MIN

    Mix under vacuum

    Mix and vacuum together for 4–5 minutes.

  4. 04 · 1 MIN

    Pour into the flask

    Fill the prepared flask within 1 minute.

  5. 05 · 2 MIN

    Vacuum the flask

    Vacuum the filled flask for 2 minutes.

  6. 06 · 180–240 MIN

    Allow to stand

    Leave undisturbed for 180–240 minutes (3–4 hours) before burnout.

Water quantity and working time follow the selected method. Keep water at 10–15°C and leave the flask undisturbed for 3–4 hours before burnout.

INJECTION-WAX BURNOUT CYCLE

Five plateaus.
Controlled progression.

14 hours before cooling · injection-wax program.

The time under each temperature is the hold at that temperature.Swipe the chart to see the complete program →

NEXUS injection-wax burnout programRamp to 110 degrees Celsius over 1 hour, hold 2.5 hours. Ramp to 300 over 1 hour, hold 30 minutes. Ramp to 720 over 2 hours, hold 4 hours. Ramp to 850 over 30 minutes, hold 1 hour. Ramp to 900 over 30 minutes, hold 1 hour. Fourteen hours before cooling. Then cool to the required flask temperature for casting; the cooling segment is schematic. Burnout time may vary with flask size.0300600900013.5571112.514°CTIME IN HOURS110 °C2 h 30 min300 °C30 min720 °C4 h850 °C1 h900 °C1 h
Injection wax
Target temperatureTime to reach targetHold at target
110 °C1 h2 h 30 min
300 °C1 h30 min
720 °C2 h4 h
850 °C30 min1 h
900 °C30 min1 h

Cooling: no fixed duration is specified; follow the temperature required by your casting process.

110°C → 300°C → 720°C → 850°C → 900°C. Burnout time may vary with flask size. The dashed cooling segment is illustrative; the final temperature depends on your casting process.

YOUR NEXT CASTING

Let’s get the details right.

Discuss NEXUS, your mixing process or your next order with our team.

LET’S TALK CASTING

Let’s talk about NEXUS.

Product selection, processing questions or a new project — share a few details with our team.

chris@certus-int.com

Your inquiry will be sent to the CERTUS team.

Open in email app chris@certus-int.com

Choose your language

Select a language. You will stay on this page.

EnglishРусскийEspañolDeutsch简体中文ItalianoالعربيةBahasa Indonesiaहिन्दीTürkçePortuguês (Portugal)ไทยFrançaisاردوفارسیO‘zbekchaTiếng ViệtPortuguês (Brasil)

Thank you for your inquiry

Our team will use the email address you provided to get back to you. For anything else, you can also reach us directly.

chris@certus-int.com